http://terminology.hl7.org/CodeSystem/v2-0256|2.9
name
v2.0256
v2.0256
package
hl7.fhir.r4.core@4.0.1
hl7.fhir.r4.core@4.0.1
content
complete
complete
status
active
active
v2 Time Delay Post Challenge
FHIR Value set/code system definition for HL7 v2 table 0256 ( Time Delay Post Challenge)
| code | display | definition | hierarchy |
|---|---|---|---|
| 10D | 10 days | ||
| 10M | 10 minutes post challenge | ||
| 12H | 12 hours post challenge | ||
| 15M | 15 minutes post challenge | ||
| 1H | 1 hour post challenge | ||
| 1L | 1 month (30 days) post challenge | ||
| 1M | 1 minute post challenge | ||
| 1W | 1 week | ||
| 2.5H | 2 1/2 hours post challenge | ||
| 20M | 20 minutes post challenge | ||
| 24H | 24 hours post challenge | ||
| 25M | 25 minutes post challenge | ||
| 2D | 2 days | ||
| 2H | 2 hours post challenge | ||
| 2L | 2 months (60 days) post challenge | ||
| 2M | 2 minutes post challenge | ||
| 2W | 2 weeks | ||
| 30M | 30 minutes post challenge | ||
| 3D | 3 days | ||
| 3H | 3 hours post challenge | ||
| 3L | 3 months (90 days) post challenge | ||
| 3M | 3 minutes post challenge | ||
| 3W | 3 weeks | ||
| 4D | 4 days | ||
| 4H | 4 hours post challenge | ||
| 4M | 4 minutes post challenge | ||
| 4W | 4 weeks | ||
| 5D | 5 days | ||
| 5H | 5 hours post challenge | ||
| 5M | 5 minutes post challenge | ||
| 6D | 6 days | ||
| 6H | 6 hours post challenge | ||
| 6M | 6 minutes post challenge | ||
| 7D | 7 days | ||
| 7H | 7 hours post challenge | ||
| 7M | 7 minutes post challenge | ||
| 8H | 8 hours post challenge | ||
| 8H SHIFT | 8 hours aligned on nursing shifts | ||
| 8M | 8 minutes post challenge | ||
| 9M | 9 minutes post challenge | ||
| BS | Baseline (time just before the challenge) | ||
| PEAK | The time post drug dose at which the highest drug level is reached (differs by drug) | ||
| RANDOM | Time from the challenge, or dose not specified. (random) | ||
| TROUGH | The time post drug dose at which the lowest drug level is reached (varies with drug) |